Skip to content
Hardware

Specified to the site. Owned by you.

Every OWL system is weatherproof, field-serviceable, and specified against the size and duration of your build — from a single fit-out floor to a multi-year mega project.

Our Product Line

Three tiers. One standard.

Engineered to capture every stage of your project with clarity, reliability, and precision — scaled to the size and duration of your build.

OWL Basic time-lapse camera
Entry Level

Basic

Compact system — small to medium projects

  • Full HD image capture
  • Long battery life
  • Weatherproof design
  • Quick, tool-free setup
  • Ideal for fit-out & facilities
OWL Premium time-lapse camera
Enterprise

Premium

Ultimate system — infrastructure & mega projects

  • 4K Ultra HD recording
  • Remote project connectivity
  • Enterprise project management
  • Solar power compatible
  • Built for mission-critical sites
SpecificationBasicStandardPremium
ResolutionFull HDFull HD4K Ultra HD
Recording DurationWeeks – MonthsMonths – YearsYears
Power OptionsBatteryBattery / ExternalBattery / External / Solar
ConnectivityLocal accessLocal / ExtendedRemote connectivity
WeatherproofYesYesYes
Project ScaleSmall – MediumMedium – LargeLarge – Mega
Ideal ForBuilding, fit-out, facilitiesCommercial, residential, industrialInfrastructure, remote, mission-critical
Frames Of View

Choose the frame before the first pour.

Lens selection defines the story your time-lapse tells. We survey the site, model the sightlines, and lock the frame before installation.

Wide field of view construction site reference

Wide

110°

Whole-site coverage. Captures the full development footprint, laydown areas, and access roads in one frame.

Master plans · Mega projects

Standard field of view construction site reference

Standard

60°

Balanced framing. The structure fills the frame with enough context to read progress against the site.

Towers · Commercial builds

Narrow field of view construction site reference

Narrow

20°

Compressed detail. Isolates a façade, core, or work front for close inspection of sequence and method.

Façades · Critical work fronts

Get In Touch

Let's frame your project.

Tell us the site, the duration, and the story you want to tell. We'll specify the system, quote the install, and get your first frame on the record.

Based

Dubai, United Arab Emirates